01Concrete and masonry facadesB03-01 · Open evidence and annotated details →Building Waterproofing Solutions
Facade & Building Envelope Waterproofing
Water management across concrete and masonry facades, curtain walls, window openings, prefabricated panel joints and transitions between envelope materials. Movement, drainage paths and adhesion compatibility are treated together.
Application Scope
One system, several project conditions
These application contexts cover the principal project conditions addressed by this system. The final build-up is defined after the substrate, environmental exposure, movement and service requirements are confirmed.
01Concrete and masonry facadesB03-01 · Open evidence and annotated details →
02Curtain wall systemsB03-02 · Open evidence and annotated details →
03Window and door openingsB03-03 · Open evidence and annotated details →
04Prefabricated panel jointsB03-04 · Open evidence and annotated details →
05Envelope transitions and movement jointsB03-05 · Open evidence and annotated details →System Logic
Technical routes are connected to conditions
Each application context is connected to the technical routes that match its substrate, installation method, environmental exposure and detailing requirements.
Joint sealing systems
Sealant type, backing material, joint geometry and adhesion testing are coordinated as one detail.
Liquid facade protection
Breathable or elastomeric protection is selected for substrate condition, crack movement and exposure.
Flashing and transition membranes
Flexible transitions connect windows, curtain walls, parapets and dissimilar materials.
Movement-joint systems
Compression seals, cover systems and waterproof transitions are matched to movement range and access.
System Build-Ups & Critical Details
Real application context connected to N/L annotated drawings
Every technical drawing is placed under its mapped application context. L labels identify construction layers; N labels identify critical details and interfaces. Final specifications remain project-specific.
B03-01 Application Context
Concrete and masonry facades
System build-ups and critical details
L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.
B03-02 Application Context
Curtain wall systems
System build-ups and critical details
L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.
B03-03 Application Context
Window and door openings
System build-ups and critical details
L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.
B03-04 Application Context
Prefabricated panel joints
System build-ups and critical details
L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.
B03-05 Application Context
Envelope transitions and movement joints
System build-ups and critical details
L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.
Visual Evidence
Application and project references
Project photographs document real construction conditions. Licensed reference photographs are labelled as context images, with AKWAX-delivered project evidence identified separately.
Decision Boundary
What must be confirmed before a route is fixed
A system proposal becomes meaningful only after these conditions are documented.
- Expected joint movement
- Water-shedding and drainage path
- Substrate adhesion and primer
- UV and weather exposure
- Compatibility between adjacent materials
Project Discussion