Building Waterproofing Solutions

Below-Grade & Foundation Waterproofing

Waterproofing for basement slabs and walls, raft foundations, pile heads, underground parking, sunken courtyards, lift pits and collection sumps. Hydrostatic pressure, substrate continuity and construction sequencing set the system boundary.

Waterproofing SolutionsBuilding Waterproofing SolutionsB02 Below-Grade & Foundation
ApplicationsSystem routesBuild-ups & detailsProject evidenceDecision boundary

Application Scope

One system, several project conditions

These application contexts cover the principal project conditions addressed by this system. The final build-up is defined after the substrate, environmental exposure, movement and service requirements are confirmed.

System Logic

Technical routes are connected to conditions

Each application context is connected to the technical routes that match its substrate, installation method, environmental exposure and detailing requirements.

01

Pre-applied bonded membrane route

Membrane selected for full bond, detailing continuity and resistance to lateral water migration.

02

Modified bitumen membrane route

SBS or compatible bituminous systems with controlled laps, upstands and protection.

03

Self-adhesive and cold-applied route

Cold construction options for constrained sites and sensitive interfaces.

04

Liquid and cementitious route

Coatings and cementitious materials used where substrate geometry and exposure support the route.

05

Joint and penetration route

Waterstops, hydrophilic profiles, sealants and injection provisions coordinated at construction joints and penetrations.

System Build-Ups & Critical Details

Real application context connected to N/L annotated drawings

Every technical drawing is placed under its mapped application context. L labels identify construction layers; N labels identify critical details and interfaces. Final specifications remain project-specific.

B02-01 Application Context

Basement slabs and external walls

7 annotated drawings
Basement slabs and external walls application context Reviewed application-context photograph.

System build-ups and critical details

L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.

B02-02 Application Context

Raft foundations and pile heads

5 annotated drawings
Raft foundations and pile heads application context Reviewed application-context photograph.

System build-ups and critical details

L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.

B02-03 Application Context

Underground parking and occupied basements

6 annotated drawings
Underground parking and occupied basements application context Reviewed application-context photograph.

System build-ups and critical details

L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.

B02-04 Application Context

Sunken courtyards and connecting structures

4 annotated drawings
Sunken courtyards and connecting structures application context Reviewed application-context photograph.

System build-ups and critical details

L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.

B02-05 Application Context

Lift pits and collection sumps

3 annotated drawings
Lift pits and collection sumps application context Reviewed application-context photograph.

System build-ups and critical details

L-series labels identify build-up layers. N-series labels identify critical nodes and interfaces. Open a drawing to inspect both annotation systems.

Visual Evidence

Application and project references

Project photographs document real construction conditions. Licensed reference photographs are labelled as context images, with AKWAX-delivered project evidence identified separately.

Decision Boundary

What must be confirmed before a route is fixed

A system proposal becomes meaningful only after these conditions are documented.

Project Discussion

Bring the condition first. The material route follows.

Contact AKWAX